I then set each frame back in its place, having had marked their orinal positions on the keel and foundation, starting with #5.
In goes #6
Finally they are all back in. There are 1-1/2 x 3" blocks on top of the keel that I will install next to where each frame meets the CB Box. They will be glued and screwed into the 2 x 6 bedlog then I will glue and crew each frame into them for additional support. There are 6 to install. 2 on each frame. I cut 12 by mistake!