The foundation
After marking the center of the foundation at both ends, I cut two 1-foot 2x4’s and shimmed them to be level with the foundation and attached them with deck screws. Taking the bow stem and placing the 48” ruler to mark the forward most point for the stem, I took the angle of the stem from the full size drawing and set it correctly, making sure it was square and dead center to the foundation. A hefty 6” clamp will hold it in place.
That went pretty quick too so on to marking out the positions for the 10 frames and the transom. These were double-checked for accuracy by comparing measurements from the front and back of the foundation.
With this done I wanted to see if I could get a couple frames mounted. First, I had to run a mason line to use as a centerline. Measured it out and attached it then I put up frame number 1. I used a plumb bob to align it with the centerline then sank a couple deck screws into the spreader to hold it in place. 2 drills, one for pilot holes and the other as a driver, made quick work out of mounting the frames to the foundation.
3 frames done
5 done!
It went so quickly that I got all 10 and the transom set!
I am going to bevel the frames in place with an electric planer and we will see how that works!
No comments:
Post a Comment